Satellite Emergency Network
Log in to saveTeens design a backup emergency-communication network that keeps working when cell towers and normal internet go down, using simple relay and range concepts to plan coverage. It's resilient-systems thinking for a very real disaster scenario.
Choose your version
Every level teaches the same core idea — pick the one that fits your time, budget, and energy today.
Setup
Print or handwrite the four Satellite Emergency Network challenge steps and place common paper supplies on one table. Prepare one small sample, dataset, scenario, or recycled-material model drawn directly from the project description; no device, paid tool, room decoration, or purchased kit is required.
Activity
- Read the Satellite Emergency Network challenge aloud, then map a region where towers have gone down and predict which relay points would keep the most people connected.
- Use paper, index cards, recycled objects, or facilitator-provided sample data to design a relay network on paper and test real range and interference using walkie-talkies around the building or yard.
- Run one tabletop trial and discover a dead zone where the signal doesn't reach, and add or move a relay point to cover it.
- Finish by present the final emergency communication plan, showing coverage and what happens if one relay point also fails; record the evidence that supports the decision.
Done when: The group completes a defensible Satellite Emergency Network solution, records at least one test result or comparison, changes one claim or design in response, and supports its final decision with that evidence.
Materials
two-way radio set, printed area map, string, marker set
Shown for the Quick Start version — switch tabs above to see what changes.
Steps
- Map a region where towers have gone down and predict which relay points would keep the most people connected.
- Design a relay network on paper and test real range and interference using walkie-talkies around the building or yard.
- Discover a dead zone where the signal doesn't reach, and add or move a relay point to cover it.
- Present the final emergency communication plan, showing coverage and what happens if one relay point also fails.